Visiting from mainland China? Try the China-friendly mirror (cn.improject.org).
News

Topic summary · Student revision

Route Inspection Topic Review summary

Self-review on the Chinese Postman problem: odd vertices, pairings, and shortest closed tours.

Files: Topic-Review-Route-Inspection.pdf · Topic-Review-Route-Inspection-Answers.pdf · free public downloads · diagrams in the PDFs

Key learning points

  • Eulerian if all degrees even — a closed trail covers every edge.
  • Semi-Eulerian if exactly two odd vertices — open trail starts/ends there.
  • For a closed tour with odd vertices, add duplicate edges from a minimum pairing.
  • Consider all pairings of odd vertices; choose the least total added length.
  • Final length = network total + length of duplicated paths.

Worked example 1 — Odds

Network has 4 odd vertices. What must you do for a closed tour?

Working

PairthemandduplicateshortestconnectingpathsPair them and duplicate shortest connecting paths

Try all pairing options.

Worked example 2 — Euler

All degrees even. Chinese postman length?

Working

SumofalledgeweightsSum of all edge weights

No duplication needed.

Worked example 3 — Practice point 1

Apply this idea from the Topic Review: Eulerian if all degrees even — a closed trail covers every edge.

Working

see answers PDF\text{see answers PDF}

Attempt without notes, then check the answers PDF.

Worked example 4 — Practice point 2

Apply this idea from the Topic Review: Semi-Eulerian if exactly two odd vertices — open trail starts/ends there.

Working

see answers PDF\text{see answers PDF}

Attempt without notes, then check the answers PDF.

Scaffolded Learning Sheet and answers (PDFs)

This page is a short, searchable overview for revision and search engines. Use the Scaffolded Learning Sheet first, then the Answers PDF for a full written solution. The printable PDFs remain the main classroom resource.

Route Inspection Topic Review summary — worksheet & answers PDF